ASAP
A & B Hitches - Hesperia - Project Location: Hesperia, CA
Finish construction and TI on partially completed approx. 8650 SF metal-framed auto shop.
Details:
Approx. 8650 SF total
Conditioned Space: 1993 SF
Metal-framed structure with sheathing/shear panels & skylights installed.
Trades Needed:
Finish Carpentry, Painting, HVAC, Plumbing, Roofing, Plastering, Alarms, Fire Sprinklers, Paving / Street Improvements, IWSO, Drywall, Block wall / masonry, Windows
Custom Home - Oak Hills
This project is under construction - some trades are hired, some are still needed. Please call us for the GC's contact info, to see if he needs your bid.
New Custom Home
Total Livable Area: 5710 sf Porch: 267sf
Garage: 928 sf Patio: 1541sf
Total Residence: 8446 sf
NOTE: The following scopes of work are are already completed, and should not be bidded: Rough Grading, Concrete Slab, Underground Utilities, Plumbing Stub-In. Additional Note: Fire sprinklers not shown in plans, but required by City.
9-01-2010
Joshua Tree County Office Building - 2 Story Building
Bids Due No Later Than 09/01/10 10:00 AM
Number of Buildings: 1
Stories above grade: 2
Square Footage: 29,750
Estimate: $6,900,000.00
Scope of Work:
Construction of a Two-Story steel structure office building totalling approx. 29,750 sq ft., modifications to existing parking lot, and misc. site work. Please Note: This is a LEED Silber Certification Goal Project... Also, Contractors are responsible for reviewing all posted updates and addendums, and that must be noted on your proposal.
8-31-2010
Colton High School New Math & Science Building
Number of Buildings - 2
This project consists of demolishing of existing cast-in-place concrete science calssroom building and construction of a new two-storey wood framed classroom and laboratory building with support spaces.
Additional work includes but is not limited to site, landscape and underground utilities.
9-21-10
Foothill Bloulevard Bike/Pedestrian Bridge, Route 66 Trailhead and Street Improvement Project.
Public Project, City of Rancho Cucamonga Engineering Dept.
Estimated Value: $8,015,000
Bids Due By: 9/21/10 2:00 pm
Project Description: The scope of work to be performed in general consists of, but not limited to, construction of an overcrossing bridge structure, reconstruction and widening of Foothill Blvd., construction of a trailhead, construction of storm drain, sewer and water, installation of traffic signals and street lights, installation of landscaping and associated civil work, complete in place, and all required by the plans and specs, etc.
09-13-10
Riverside County Mecca Fire Station No. 40
Work Type: Alteration
Value: $500,000
Bids: 9/13/10 - 10:00 AM
Location:
91-350 66th Ave.
Mecca, CA 92254
Building: 1 Stories: 1 Floor Area: 12411 SF
Description of work is in plan set.
7-22-2010
Rialto Fergusson Park Renovation
Scope of Work
Park, Landscaping Renovation of an existing park in the City of Rialto
7-21-2010
Construction of a new fire station in the City of Rialto.
Bids Due ASAP
MASONRY BIDS NEEDED!
In general, the project consists of Foundation & Site Concrete, Flooring, Brick Veneer, Stucco and HVAC Start up & Charge.
Bids Due 07-29-2010
Project Estimated Value: $550,000
In general the project consists of remodeling the existing auditor/controller/tax collectors offices. All work will be after hours or weekends and includes, but is not limited to; Demolition, Doors/Frames/Hardware, Door Openers, Cabinetry, Rollup Counter Door, Fire Alarm, Plumbing, Toilet Partitions and Accessories, Drywall, Steel Stud Framing, Storefront, Glass and Glazing, Misc Steel, Fire Sprinklers, Acoustic Ceiling, Ceramic Tile, Painting, Solid Surface Counters, Flooring, HVAC, and Electrical.
Bids Due 07-28-2010
Project Estimated Value: $1,000,000
Project consists of constructing a new Chevron Gas Station with a Car Wash & Convinience Store involving all major trades.